Develop in Portugal
FAQ
Madeira & the Azores · 06/17

Machico

Machico combines permanent housing, local commerce, airport proximity, beach activity and tourism.

The decision this location helps you make

Character

Permanent housing, local commerce, airport proximity, beach activity and tourism on the east coast.

Demand

Local households, airport-related activity, domestic beach tourism and seasonal visitors.

Pricing context

Local-income led, with a seasonal tourism overlay.

Access

Expressway and airport proximity; local road and parking constraints.

Planning and constraints

Flood and watercourse risk, heritage, aircraft exposure, parking and infrastructure.

Principal risk

Confusing seasonal occupancy with permanent residential demand.

Typical products

Permanent housingSmaller hotelsServiced apartmentsUrban rehabilitationSenior living

Seasonal beach activity and permanent residential demand should be modelled separately before the product mix is fixed.

Potential project types

  • Permanent housing
  • Smaller hotels
  • Serviced apartments
  • Urban rehabilitation
  • Senior living
  • Local retail
  • Mixed-use projects

What to verify first

  • Local demand
  • Aircraft exposure
  • Flood and watercourse risk
  • Parking
  • Heritage
  • Infrastructure
  • Seasonal versus permanent occupancy

Best suited to

  • Local housing
  • Small hospitality
  • Urban rehabilitation

Watch first

Flood and watercourse exposure in the town centre must be mapped before design.

Legal support through VVA

Once a site or project is identified, the focus shifts from general guidance to that specific transaction: title, planning position, licensing, charges, contracts and the holding structure.

Legal services are provided by Valente Veiga & Associados.

This page provides general information about property development in Madeira and the Azores. It does not constitute legal, planning, environmental, architectural, engineering, geological, valuation, tourism, insurance, tax, investment or financial advice. Planning rights, building capacity, natural-hazard exposure, infrastructure capacity and market conditions depend on the specific property, island, municipality, project, use and submission date. Obtain project-specific professional advice before acquiring land, relying on an existing building, submitting a planning procedure, commencing works or marketing an investment.

6/17