Developer guides

Practical briefings for each decision point of a development in Portugal: what to do, which documents to gather, what usually goes wrong and which tools help.

16 guides5 stages, from land to exit
QUICK ANSWER

How the developer guides work

The library covers a full development cycle in Portugal: securing land, testing the numbers, clearing the licensing route, structuring and funding the vehicle, delivering construction, and finally selling, letting or holding the asset.

You do not need to read all sixteen guides. Start with the stage your project is in, work through its guides, then move to the next stage when the decisions in that stage are closed.

Editorial guidance for developers and investors. It is not legal, tax or planning advice for a specific project.

01

Where is your project today?

Pick the stage you are in and read only what it needs.

  1. 01Land & feasibility
  2. 02Planning & consents
  3. 03Structure & funding
  4. 04Delivery & cost
  5. 05Tax, sales & exit
01Stage

Secure the land and test whether the scheme works

Before anything is signed, the land has to be readable: what the plan allows, what the registry and tax records say, and what physical or environmental constraints sit on the plot.

In parallel you build a first feasibility model — buildable area, indicative build cost, revenue assumptions and the margin that survives contingency. If the numbers only work in a best case, the site is not ready.

What you should have at the end of this stage
  • Plan position and constraints read on the plot before exclusivity
  • Registry, tax and licensing history reconciled
  • First feasibility model with contingency and sensitivity
  • A walk-away price and a decision on whether to proceed

Next: Take the confirmed envelope into the licensing route.

02Stage

Choose and clear the licensing route

The route you choose — information request, licensing or prior communication — decides how much time and risk sits between purchase and site start. External authorities can add months if they are discovered late.

Sustainability and energy requirements now shape the design brief rather than the paperwork at the end, so they belong in this stage too.

What you should have at the end of this stage
  • Procedure selected and justified in writing
  • External authority consultations mapped and sequenced
  • Design brief aligned with energy and certification requirements
  • Realistic consent programme feeding the cash-flow model

Next: Structure the vehicle and lock the funding before construction commits spend.

03Stage

Set up the vehicle, the team and the money

Ownership structure, partner arrangements and the funding stack should be settled before the first construction contract. Retro-fitting a structure after acquisition is expensive and sometimes taxed twice.

The team you appoint at this point — designers, project manager, cost consultant, legal — determines how well the following two years run.

What you should have at the end of this stage
  • Vehicle chosen with tax and exit consequences understood
  • Partner or joint-venture terms documented before spend
  • Funding stack committed with drawdown conditions checked
  • Core consultant and delivery team appointed

Next: Move into procurement and delivery with the budget under control.

04Stage

Procure, build and keep the budget honest

Delivery risk is mostly contractual. The procurement route, the contract form and the way variations are priced decide whether cost growth is visible early or arrives as a claim at completion.

Cost control and risk transfer run alongside the programme, not after it: guarantees, insurances and value engineering all have deadlines of their own.

What you should have at the end of this stage
  • Procurement route and contract form matched to the scheme
  • Cost plan tracked against commitments, not estimates
  • Insurances, bonds and guarantees in place before site start
  • Change control that prices variations before they are built

Next: Prepare the tax and exit position while the building completes.

05Stage

Sell, let or hold — and close the tax position

Tax is decided at acquisition and structuring, but it is paid at exit. The guides in this stage connect the two so the modelled margin is the margin actually received.

If the plan is to hold and operate rather than sell, the operating model has to be designed before completion, not improvised afterwards.

What you should have at the end of this stage
  • Tax position across the cycle reconciled with the model
  • Sales or letting strategy with documented pricing logic
  • Handover, warranties and use title complete
  • Operating model in place for held assets
02

The full library

General information only. It is not legal, tax or planning advice for a specific site or project.

  1. 01In depthBuying land for developmentHow to price, condition and secure a plot without inheriting planning or title problems.9 minOpen guide
  2. 02In depthRunning a first feasibility checkThe minimum set of numbers that tells you whether a site is worth pursuing at all.7 minOpen guide
  3. 03In depthNavigating the licensing routeHow the municipal process actually runs, and where developers lose the most time.10 minOpen guide
  4. 04In depthStructuring the project vehicleChoosing the ownership structure before you buy, so exit and tax stay clean.8 minOpen guide
  5. 05In depthFinancing a developmentWhat Portuguese lenders look for, and how to phase equity against drawdowns.8 minOpen guide
  6. 06In depthDelivering the construction phaseContract form, site controls and the certifications you need to sell later.9 minOpen guide
  7. 07In depthTaxes across the development cycleIMT, stamp duty, VAT, IMI and corporate tax, and when each one lands.8 minOpen guide
  8. 08In depthSelling and exiting the schemePreparing the legal and commercial package that lets units complete on time.7 minOpen guide
  9. 09In depthJoint ventures and partnershipsCombining land, capital and promotion without losing control of the programme.8 minOpen guide
  10. 10In depthUrban rehabilitation and existing buildingsReusing existing fabric without inheriting an unpriced building.8 minOpen guide
  11. 11In depthConstruction contracts and procurementChoosing the contract model and running a tender that produces comparable bids.9 minOpen guide
  12. 12In depthCost control and value engineeringHolding the budget from feasibility to handover without damaging sales value.8 minOpen guide
  13. 13In depthSustainability, energy and certificationBuying performance in the design instead of compensating with plant.8 minOpen guide
  14. 14In depthRisk, insurance and guaranteesDeciding what is transferred, what is insured and what you are knowingly carrying.8 minOpen guide
  15. 15In depthBuild-to-rent and operating the assetDesigning and structuring a scheme that is held rather than sold.8 minOpen guide
  16. 16In depthBuilding the development teamWho to appoint, in what order, and how to supervise from abroad.8 minOpen guide
03

Common mistakes developers make

Recurring patterns behind delayed, over-budget or unsellable schemes.

  1. 01Signing a promissory contract before the plan position and constraints are read on the plot.
  2. 02Modelling on a best-case buildable area instead of the area a municipality would actually approve.
  3. 03Choosing a licensing procedure to save time and then losing more time on external consultations.
  4. 04Setting up the ownership vehicle after acquisition and paying transfer costs twice.
  5. 05Committing to construction before funding conditions precedent are genuinely satisfied.
  6. 06Treating cost control as monthly reporting rather than change control before work is built.
  7. 07Leaving energy and certification requirements to the end of the design process.
  8. 08Planning the exit only when the building is finished, when the tax position is already fixed.
04

Related guides

Continue with the pillars developers use alongside this library.